The “barn” door opening has been cut and will have a double sliding door to finish it (eventually.)

IMG_20170703_132116

Start of landscaping by the same crew that did the initial site work.  They had available a lot of granite blocks from an old foundation most with at least one or two good faces. Everything shown below was accomplished in just two full days of work!

IMG_20170703_083918

Lots of loam needed to be delivered and spread for the lawn.

IMG_20170703_083934

IMG_20170703_093752

IMG_20170703_093951

IMG_20170703_110218

Blocks ready and being placed to make a retaining wall/gardening space near the driveway.

IMG_20170703_110256

IMG_20170703_110759

Many decisions on rock placement…

IMG_20170703_123647

IMG_20170703_124240

IMG_20170703_132057

IMG_20170703_133655

IMG_20170703_133708

IMG_20170703_151058

IMG_20170703_152426

 

IMG_20170703_170314

IMG_20170703_170320

IMG_20170703_170521

Some thin more finished blocks were delivered separately and reserved for a step in front of the barn door, and a short retaining wall near the workshop.

IMG_20170703_170623

IMG_20170703_170638

IMG_20170704_083637

Many more decisions on rock placements…

IMG_20170704_083647

IMG_20170704_083716

Adding loam to the gardening spaces along the walls.

IMG_20170704_101735

IMG_20170704_102404

IMG_20170704_102411

Placing one of the more finished blocks for retaining the drive along the workshop.

IMG_20170704_103138

IMG_20170704_103225

IMG_20170704_103344IMG_20170704_103354

Work on the garden back of the workshop.

IMG_20170705_080317

Creating a better drainage area along the driveway.  This area seems to pick up a fair amount of water that apparently collects and flows along ledge to exit here.

IMG_20170705_102329

Rolling the loam for seeding the lawn.

IMG_20170705_102334

The completed retaining wall next to the workshop.

IMG_20170705_164820

Finished retaining walls and drainage area.

IMG_20170705_164850

IMG_20170705_164902

Some leftover pieces of granite were placed more roughly to retain the area in front of the workshop.

IMG_20170705_164918

Beginning siding for the garage.

IMG_20170705_164937

The second more finished piece placed as a step in front of the “barn” door.

IMG_20170705_165001