Photos from week 2 (January 23-27)

Second floor with subfloor mostly completed except for one sheet loose.  The drain for the shower was incorrectly located by the factor and has to be moved.

img_20170125_152423

Beginning work on the rest of the ell and connection to the garage.

img_20170125_152514

A lot of stuff got slowed down by a two day freezing rain/ice/sleet/rain event. The crew of two (sometimes three) mostly worked inside on miscellaneous stuff.

img_20170125_153223

img_20170126_103833

img_20170126_103852

img_20170126_145006

Looking from the kitchen area into the ell.  It looks really long, but there will be a wall and a fireplace separating it from the entryway next to the garage end.

img_20170126_145127

img_20170126_145137

Upstairs over the ell.  There was some potential for storage space in here, but the only access is a rather small cubby hole through the upstairs bathroom wall.  We’ve decided to just use the space for extra insulation.

img_20170126_145322

img_20170126_145352

img_20170126_150452

img_20170126_151723

img_20170127_105658

img_20170127_114821

img_20170127_115216

img_20170127_115224

The rest of the roof will be shingled early next week and the doors and window in the newly framed section will be put in place.  Once this is done it will be possible to have some temporary heat for inside work.

img_20170127_134827