The drywall hanger was done upstairs in just a couple days except for a couple spots where they ran out of drywall apparently because the truck didn’t get loaded with all the sheets it was supposed to have.

IMG_20170425_153359

IMG_20170425_153423

IMG_20170427_165617

IMG_20170427_165626

IMG_20170427_165635

IMG_20170427_165656

The firewall between the garage and house has been completed (portions above have the firewall on the other side of the roof.)  The material is Roxul 2″ comfortbat backed up by additional Roxul insulation.  We will probably choose to cover this somewhat fuzzy material with something else in the future.

IMG_20170428_153947

The downstairs bathroom has the floor installed and is functional, though not fully painted.

IMG_20170427_165559

Its not visible in the photo below, but the study room has ceiling and walls fully painted and needs only flooring and trim.  The front hall and pantry also are fully painted.

IMG_20170428_154023

The taping and mudding began Saturday morning with a full crew, and they are expecting to be finished everywhere by the end of the week including a prime coat.