Shelves for the front hall bookcase are completed, but the trim can’t be done until the doors are first trimmed because they will have to intersect with each other.

IMG_20170418_155423

The center of the staircase has been cut down in preparation for staircase work, and some rough 2×4 built-up newels and rails have been set in place to determine how they can best be attached.

IMG_20170419_154312

IMG_20170419_154321

IMG_20170419_154343

The upstairs drywall has been delivered and the dry wall guy will begin work next week.

IMG_20170420_142334

IMG_20170420_142718

IMG_20170420_142754

IMG_20170420_143140

The hybrid hot water heater is installed and functional, including a digital display and internet connection.

IMG_20170420_150724

House without the Black Bros. trailer (which had to be moved for the drywall delivery.)

IMG_20170420_154556

The pantry trim is nearly finished and ready for paint.

IMG_20170421_150017

The entry/dining ell is wired, insulated, and the drywall has been hung, and with this completed, the heat is on, making everything easier for everyone.

IMG_20170421_150047

IMG_20170421_150100

The staircase will get vertical boards (wider than shown mocked up) and the bottom of the staircase will have this general appearance also with vertical boards.

IMG_20170421_150109

IMG_20170421_150127

Kitchen cabinets are all but completed, and the Granite Shop will measure for the countertops this coming week.

IMG_20170422_144658

This weeks photos are posted in memory of Sam who had to be put down unexpectedly this morning after he suffered a significant stroke without any warning signs.

DSCN2470.JPG

IMG_0365.jpg

He was a loving lap, couch, bed, and even, desktop “buddy.”

2014-09-04 08.20.49.jpg